e⚡TruckTCO BE

Home › Specifications › Ekoenergetyka SAT 1500 MCS

Ekoenergetyka · Charger sheets

Ekoenergetyka SAT 1500 MCS

The Polish maker's megawatt satellite, now sold as Axon Sat MCS: up to 1,500 A on an MCS plug, optionally with a 600 A CCS plug, and more than 1 MW. It is in public use at two St1 truck hubs in Norway. We could not find Ekoenergetyka in the IAA 2026 exhibitor list, and no price is published.

Ekoenergetyka SAT 1500 MCSPhoto: Ekoenergetyka
22 of 43 values are filled in. Know one we are missing, or one that is wrong? This sheet is open for anyone to correct — type into it on eTRUCKTCO.eu, press Review & send, and confirm the e-mail. It is on all three sites the moment we have checked it. Correct or complete this sheet

Company 3 / 4

CompanyLegal nameEkoenergetyka-Polska S.A.↗
HeadquartersCity, countryZielona Góra, Poland↗
Parent groupnot published
Websiteekoenergetyka.com↗

IAA Transportation 2026 0 / 5

Hall and standNot found in the IAA exhibitor directory under Ekoenergetyka or Axon (searched 16 September 2026); Ekoenergetyka's events page shows IAA Hanover only in its event gallerynot published
Premiered in HanoverWorld or European premieres on the standnot published
Charging products on the standModels shownnot published
Announcements at the showPartnerships, orders, launch datesnot published
Who to talk to on the standName and role, as the maker publishes itnot published

The charging system 12 / 19

ModelProduct name as sold since Ekoenergetyka launched its Axon Charger product brand in April 2026; its news still uses SAT1500Axon Sat MCS (earlier name: SAT 1500 MCS)↗ ↗ ↗ ↗
ArchitecturePlaced to suit truck lanes; one satellite can serve two trucks at once, for example on an island between two lanes. Earlier on this sheet: Split DC satellite dispenser, compact, charges two vehicles at onceSplit DC: a satellite with the charging cables and screen, fed by a separate central power unit↗ ↗ ↗
Power per cabinet or unitNot published for the MCS system. Ekoenergetyka's own power unit, the Axon Side DLBS, is rated 480 kW with up to 6 outputs, 500 A per output and 1,200 A over all outputs (preliminary data sheet, January 2026); the product pages do not say which power unit feeds the MCS satellitenot published
Power-sharing stepSmallest block of power that can move between outletsnot published
Outlets per power unitTwo versions of the satellite; Ekoenergetyka says one satellite can charge two vehicles at once. Earlier on this sheet: 2 vehicles per satellite1 MCS, or 1 MCS + 1 CCS↗ ↗
Max power per CCS outletnot published
Max current, CCSLiquid-cooled CCS (HPC) connector on the MCS + CCS version600 A↗ ↗
Megawatt Charging System (MCS)available / planned / noavailable↗
Max power per MCS outlet"More than 1 MW" (maker). St1's Tvedestrand hub lists its SAT1500 at up to 1.2 MW, the Koppang hub up to 1.5 MW. In St1's first test with the haulier ASKO the MCS delivered about 700 kW, peak 723 kW (Ekoenergetyka, 1 December 2025)> 1000 kW↗ ↗ ↗ ↗
Max current, MCSMCS connector allows up to 3,000 A1500 A↗ ↗ ↗
Output voltage rangeNot published for the satellite; Ekoenergetyka's Axon Side DLBS power unit delivers 150–1,000 Vnot published
Efficiency, grid to plugAs published by the makernot published
Loss grid to battery, overnight depotAs assumed in the eTRUCKTCO calculatorsNot in the calculators %↗
CoolingLiquid-cooled cables / airLiquid-cooled MCS and CCS cables and connectors, with temperature and current monitoring↗ ↗
Cable lengthStandard on both versions; 4.5 m option for the MCS-only version (the cable then touches the ground)3 m↗
Protection and temperature rangeUp to 2,000 m altitudeIP54, IK10; −35 to +55 °C↗ ↗
Noisenot published
Battery bufferBuilt-in storage to soften the grid peak, if anynot published
Size and weightCabinet and dispenser. Power unit: Axon Side DLBS 2,300 × 1,000 × 1,050 mm, about 1,000 kg, if that is the one used (not stated)Satellite 2,150 × 1,000 × 470 mm (H × W × D), about 400 kg, galvanised steel housing↗

Software and standards 3 / 4

OCPPVersion1.6J and 2.0.1↗ ↗
ISO 15118 / Plug & ChargeISO 15118-20, plus IEC 61851-1, -23 and -24 and DIN 70121↗
Load and fleet managementDynamic power sharing, depot peak controlnot published
Software offeredBack-end, app, monitoring10-inch touchscreen with RFID; optional 19-inch screen for adverts or fleet information, managed remotely; optional payment terminals (Castles, Payter, Ingenico, Pax); MID or Eichrecht DC meter; fibre-optic link to the power unit↗ ↗

Buying and running it in Europe 2 / 8

List pricePer cabinet or per outlet, say whichnot published
Price per kW installedHardware only or turnkey, say whichnot published
Availability in EuropeOrder now, deliveries from …In public use at St1 truck hubs in Norway (Tvedestrand, announced 1 December 2025; Koppang, announced 28 January 2026); the data sheet is still marked preliminary (March 2026)↗ ↗ ↗
Units delivered in Europe to datenot published
Reference customers in EuropeFleets, operators, hubsSt1 in Norway: Tvedestrand, between Oslo and Stavanger (5 charge points, 2 MW, Ekoenergetyka's first MCS site, tested with ASKO on 28 November 2025), and Koppang (4 charge points, 1.6 MW, open to the public since January 2026)↗ ↗
WarrantyYears, service levelsnot published
Service network in EuropeOwn technicians, partners, response timenot published
Turnkey partnersWho installs it, including the grid connectionnot published

On this site 2 / 3

In the eTRUCKTCO calculatorsWhich option, and with what loss and cost factornot published
Trucks on this site it can charge at full powerSee the truck sheetsEvery truck of the T&E comparison except the DAF XG Electric is MCS-capable or announced so (MAN eTGX up to 750 kW): see the truck sheets at /sheets/avs/↗
Anything else worth knowingEkoenergetyka claims about 35 minutes for a megawatt charge, to fit the driver's 45-minute break; in St1's first test, charging took 25–45 minutes instead of about 70, depending on truck and charging curve. Unveiled at IAA Transportation 2024; not found in the 2026 exhibitor directory↗ ↗ ↗ ↗

Where these figures come from