e⚡TruckTCO BE

Home › Specifications › Mercedes-Benz eActros Lowliner

Mercedes-Benz Trucks · More electric trucks

Mercedes-Benz eActros Lowliner

Mercedes-Benz's electric Lowliner, a 4x2 tractor with a low fifth wheel for mega trailers with up to 3 metres of inside height, shown to the public for the first time in Hanover: 414 or 621 kWh, about 500 km with the larger battery, a payload of about 24 or 21 tonnes. Orders open in the third quarter of 2026 and production starts in the second quarter of 2027. What it costs to run against a diesel Lowliner cannot be worked out yet: Daimler has published no price. And until megawatt charging comes, in the second half of 2027, it charges at 400 kW at most: 10 to 80 % takes about 46 minutes with the small battery and 70 with the large one.

Battery414 / 621 kWh
Range500 km
DC charging1000 kW
Payload24 / 21 t
Mercedes-Benz eActros LowlinerPhoto: Daimler Truck
30 of 77 values are filled in. Know one we are missing, or one that is wrong? This sheet is open for anyone to correct — type into it on eTRUCKTCO.eu, press Review & send, and confirm the e-mail. It is on all three sites the moment we have checked it. Correct or complete this sheet

General 8 / 19

ModelTwo versions, named after the battery: two packs or threeeActros 400 Lowliner and eActros 600 Lowliner↗ ↗
Vehicle typeA Lowliner is a tractor with a particularly low fifth wheel, for trailers with more room inside, as Daimler explains itBattery-electric tractor unit with a low fifth wheel, for high-volume transport with mega trailers↗ ↗
Axle configuration4x2↗ ↗
Gross combination weightNot published for the Lowliner. Daimler's release says the eActros 600 it is based on is technically designed for up to 44 tnot published
Gross vehicle weight, tractorNot publishednot published
Kerb weight, tractorNot published; the two-pack version is the lighter one, which is where its extra payload comes fromnot published
Payload, with a standard trailerMaximum payload: about 24 t for the eActros 400 Lowliner (two packs), about 21 t for the eActros 600 Lowliner (three); trailer not stated. The June announcement said 'up to' 24 and 21 t24 / 21 t↗ ↗
Payload if the Council position on 96/53/EC is adoptednot published
Front / rear axle design loadNot publishednot published
Drive-axle load at maximum payloadNot publishednot published
Overall length, tractorNot publishednot published
Overall widthGiven as the width of the cab2500 mm↗
Overall heightNot publishednot published
Wheelbase4000 mm↗ ↗
Turning radius, minimumNot publishednot published
Top speedNot publishednot published
SuspensionNot publishednot published
Fifth wheelSo a mega trailer stays within the legal overall height with up to 3 m of inside height; Daimler publishes no height in millimetres. electrive (2 June 2026) writes that Lowliners generally have a 950 mm fifth-wheel height, without giving it as a figure for this truckLow: the same fifth-wheel height and ground clearance as comparable diesel trucks↗ ↗
Clean-sheet electric design or converted diesel platformOn the standard eActros 600 the packs sit across the frame, underneathA variant of the eActros 600, with the battery packs moved along the frame to make room for the low fifth wheel↗

Battery 4 / 9

Battery capacity, installed (gross)Two or three LFP packs of 207 kWh each: 414 kWh in the eActros 400 Lowliner, 621 kWh in the eActros 600 Lowliner. Nominal capacity of a new battery414 / 621 kWh↗ ↗
Battery capacity, usableNot published in kWh. Daimler's June announcement says more than 95 % of the capacity can be used, as in every current eActrosnot published
Cell chemistryLFP (lithium iron phosphate)↗ ↗
Cell supplierNot publishednot published
System voltagePublished as an '800-volt' electrical system, not as a nominal voltage800 V↗ ↗
Pack architectureOn the standard eActros 600 the packs sit across the frame, underneathTwo or three packs of 207 kWh, mounted lengthwise along the frame↗
Battery life, ratedNot published for the Lowliner. For the eActros 600, Daimler gives up to 1.2 million km in ten years with the battery still above 80 % healthnot published
Operating temperature, battery and thermal systemnot published
Battery warrantyNot publishednot published

Range and energy 3 / 8

Range, as claimedeActros 600 Lowliner (621 kWh), 'at full payload'; no figure for the eActros 400 Lowliner. Daimler adds that tyres and trailer matter more for a Lowliner's range than for a standard tractor's, and that lighter volume loads can give more500 km↗ ↗
Range, favourable conditionsEstimate from Mercedes-Benz Trucks' range calculator: eActros 600 Lowliner with a mega trailer, about 10 % load, long-haul driving, 20 or 30 °C. At full load the calculator gives 460 to 520 km between −10 °C and 40 °C (510 km long-haul at 20 °C). For the eActros 400 Lowliner: 290 to 340 km at full load and up to 490 km at 10 % load. Daimler bases the calculator on simulations and real driving tests; it is not a measured range720 km↗
Range, real-worldnot published
Range test conditionDaimler's footnote to the figure. The release text itself says 'at full payload'; the June announcement put it as about the same as the eActros 600's 500 km at 40 tMeasured by Daimler with a 4x2 tractor at 40 t, 20 °C outside, long-haul driving, battery preconditioned; may differ from the official EU calculation↗
Energy consumptionNot published. 621 kWh over 500 km works out at about 1.2 kWh/km — a sum, not a Daimler figurenot published
Test fleet mileagenot published
Drag coefficient (Cd)not published
Regenerative braking, peakNot published in kW. The June announcement names five recuperation levels and one-pedal drivingnot published

Charging 3 / 6

DC charge portsMCS charging becomes available in the second half of 2027CCS2 as standard; an extra MCS socket as an option, both on the left-hand side↗ ↗
Max DC charge powerOn MCS, eActros 600 Lowliner, from the second half of 2027; the eActros 400 Lowliner takes up to 700 kW. On CCS2, from the start: 400 kW1000 kW↗
Charge time 20–80 %Daimler gives 10–80 %, not 20–80 %: on CCS2 at 400 kW about 46 minutes (two packs) or 70 minutes (three), measured to ISO/SAE 12906 at a standard DC fast charger with 500 A; on MCS, from the second half of 2027, about 27 minutes at 700 kW (two packs) or 29 minutes at 1,000 kW (three)not published
Megawatt Charging System (MCS)The June announcement said only 'later'. At the show, Daimler Truck and Milence demonstrate megawatt charging in Hall 14/15Yes, as an option from the second half of 2027: up to 700 kW (two packs) or 1,000 kW (three)↗ ↗ ↗
AC chargingnot published
Vehicle-to-grid / bidirectionalnot published

Powertrain 4 / 7

Motor layoutElectric drive axle with two motors, from the eActros 600↗ ↗
Continuous power400 kW↗ ↗
Peak power600 kW↗ ↗
Peak torqueNot publishednot published
TransmissionFour-speed gearbox, combined with the motors in the drive axle↗ ↗
Gradeability, maximumNot publishednot published
Acceleration 0–80 km/h at GCWnot published

Safety 1 / 3

Truck safety ratingNot published for the Lowlinernot published
Driver assistance (ADAS)As Daimler describes it for the second-generation eActros; standard or optional not stated. Per the eActros page, Active Brake Assist 6 Plus acts on vehicles up to 90 km/h and on pedestrians and cyclists up to 60 km/h, and Active Sideguard Assist 3 can brake on its own up to 20 km/h. Predictive Powertrain Control takes hills, bends and traffic signs into accountEmergency braking (Active Brake Assist 6 Plus), turning assistant (Active Sideguard Assist 3), Front Guard Assist, Active Drive Assist 3, driver-alertness camera (Attention Assist 2) and predictive cruise and gear control (Predictive Powertrain Control); six sensors watch 270° around the truck↗ ↗
Braking and stabilityNot publishednot published

Cab and equipment 2 / 5

Cab typeProCabin sleeper cab with a flat floor, 2.50 m wide, as Stream, Big or Giga↗
Standard equipmentThe Multimedia Cockpit is named as standard. Mercedes-Benz Trucks' eActros page lists heated seats, a fridge and a 230 V socket as options, and a bed with a full slatted base and 7-zone cold-foam mattress as standard in the ProCabinMultimedia Cockpit Interactive 2 with a 12-inch touchscreen and voice control, MirrorCam camera mirrors, a second fridge, a 230 V socket and USB-C sockets↗ ↗
Power take-off (ePTO)Not published for the Lowliner. For the eActros range, Mercedes-Benz Trucks lists an electric PTO of up to 90 kW (DC) or 22 kW (AC, 400 V) and a mechanical PTO of up to 70 kWnot published
Driver positionnot published
TyresNot publishednot published

Service and warranty 0 / 5

Service intervalnot published
Vehicle warrantyNot publishednot published
Service network in Europenot published
Over-the-air updatesnot published
Telematics / fleet portalNot named for the Lowlinernot published

Production and market 3 / 12

Production / assemblyMercedes-Benz plant in Wörth am Rhein, Germany; series production from the second quarter of 2027↗ ↗
Key suppliersnot published
First customerNo customer named. Daimler says the Lowliner will let it electrify volume transport in its own inbound logistics toonot published
Homologation in the EUnot published
Availability in EuropeDelivery date not published; series production starts in the second quarter of 2027Orders from the third quarter of 2026 in what Daimler calls its EU30 markets, and in further international markets↗ ↗
Trucks delivered to datenot published
List price, EuropeNot publishednot published
Lease ratenot published
Maintenance costnot published
Residual value after 5 yearsnot published
Toll and CO₂ classEU CO₂ class 5 = zero-emissionnot published
IAA Transportation 2026Daimler calls it a public debut, not a premiere: the truck was announced on 2 June 2026Hall 19/20, Stand A41 (on show, its first public showing; Mercedes-Benz Trucks press conference on the media day, 14 September); Daimler Truck's other public debut in Hanover is the NextGenH2 fuel-cell truck↗ ↗ ↗

Company 2 / 3

ManufacturerMercedes-Benz Trucks, part of Daimler Truck (Leinfelden-Echterdingen, Germany)↗ ↗
Websitemercedes-benz-trucks.com↗
Sales contactnot published

Where these figures come from

Other more electric trucks